Managed multi-gigabit switching for growing networks
Ubiquiti Pro Max 24 USW-Pro-Max-24 in Dubai, UAE
The USW-Pro-Max-24 gives business networks a measured path from Gigabit access to 2.5 GbE, supported by 10G SFP+ uplinks, Layer 3 functions and UniFi management. It is aimed at buyers who need higher endpoint capacity without paying for multi-gigabit speed on every copper port.
Plan the correct switch configuration
Confirm port speeds, non-PoE suitability, SFP+ media, rack requirements and the UniFi management environment before ordering.
Direct answer for buyers
The Ubiquiti Pro Max 24, model USW-Pro-Max-24, is a 1U managed network switch with sixteen 1 GbE RJ45 ports, eight 2.5 GbE RJ45 ports and two 10G SFP+ uplinks. It is mainly used to connect a mixed estate of standard business devices and higher-speed endpoints such as modern Wi-Fi access points, workstations, servers or network storage, while remaining centrally managed through UniFi. It should be considered by organisations already using, or planning to use, the UniFi platform. Before proceeding, confirm that PoE is not required from this switch, that the eight 2.5 GbE ports are sufficient, and that the selected SFP+ modules or direct-attach cables match the upstream equipment.
What the switch does
The Pro Max 24 acts as a managed access or distribution switch inside a UniFi network. Its port mix lets administrators preserve ordinary Gigabit connectivity for printers, desktops, controllers and other devices while assigning 2.5 GbE ports to equipment that can use additional bandwidth. Two 10G SFP+ interfaces provide higher-speed uplinks to a gateway, aggregation switch, server or storage platform, subject to transceiver and cabling compatibility.
Etherlighting port illumination can make physical port identification easier during installation and support work. The feature is most useful when port states and assignments are configured consistently in the UniFi interface. It should be viewed as an operational aid rather than a replacement for rack labels, cable records or network documentation.
Who it suits
This model may suit established offices, education facilities, hospitality operations, retail groups, design studios, clinics, branch sites and technology teams that want a compact 24-port switch with a selective multi-gigabit upgrade path. It is particularly relevant where only a limited number of endpoints require more than 1 GbE and where power is supplied through separate PoE switches, injectors or local adapters.
It may not be the right choice when most connected endpoints need PoE, when more than eight copper devices require 2.5 GbE, or when the design requires dense 10 GbE access. In those situations, buyers should compare a Pro Max PoE model, a higher-density multi-gigabit switch or a dedicated aggregation option.
Business challenges this model can address
Mixed-speed endpoint estates
Many organisations do not need every user port to operate above Gigabit speed. The mixed port layout allows network teams to reserve faster ports for selected endpoints while keeping the remaining ports available for conventional devices.
Uplink bottlenecks
Two 10G SFP+ ports can provide greater upstream capacity than a single 1 GbE uplink. The final benefit depends on topology, traffic patterns, link aggregation design, upstream interfaces and the performance of connected systems.
Operational visibility
Central UniFi administration can simplify VLAN assignment, port profiles, monitoring and change control for teams already standardising on the platform. Appropriate controller access, backups and administrative practices remain necessary.
Rack and cabling organisation
The 1U format and front-facing connections support conventional rack deployment. Correct rack depth, ventilation, patch-panel placement, power access and cable-management accessories should be reviewed during planning.
Product-fit decision matrix
| Requirement | Suitable when | Confirm before ordering |
|---|---|---|
| Mixed 1 GbE and 2.5 GbE access | Only selected endpoints need multi-gigabit speed | Count all present and planned 2.5 GbE devices |
| 10G uplinks | The gateway, aggregation layer or server supports SFP+ | Optics, fibre type, DAC length and vendor compatibility |
| Non-PoE switching | Connected devices have independent power | No access point, camera or phone requires switch power |
| UniFi management | The organisation uses a compatible UniFi management environment | Controller hosting, access rights, backups and update policy |
| Layer 3 functions | The required routing features fit the supported UniFi design | VLAN count, routing policy, ACL needs and gateway architecture |
Verified technical information
| Brand | Ubiquiti |
|---|---|
| Product name | UniFi Pro Max 24 |
| Model | USW-Pro-Max-24 |
| Product type | Managed Layer 3 Ethernet switch |
| 1 GbE RJ45 ports | 16 × 10/100/1000 MbE |
| 2.5 GbE RJ45 ports | 8 × 100/1000/2500 MbE |
| SFP+ ports | 2 × 1/10 GbE |
| PoE support | No PoE output on this model |
| Form factor | 1U rack mount |
| Dimensions | 442 × 325 × 44 mm |
| Redundant power option | DC power backup ready; compatible backup equipment and design must be confirmed |
| Management | UniFi management environment |
| Port identification | Etherlighting supported |
| Availability | Contact FourTeck for current UAE model, regional version and lead-time options |
Important dependency: this is the non-PoE model
The USW-Pro-Max-24 should not be confused with the USW-Pro-Max-24-PoE. The non-PoE unit carries network traffic but does not provide electrical power through its RJ45 ports. A buyer connecting wireless access points, IP cameras, VoIP phones, door-access devices or other powered endpoints must provide power through another PoE switch, suitable injectors or local adapters. The correct decision depends on device count, power standards, total power budget, rack design and future expansion. FourTeck can help compare the bill of materials before the quotation is finalised.
A practical purchase and deployment journey
Map connected devices
List each endpoint, required speed, power method, VLAN and physical location. Include near-term additions rather than sizing only for the current day.
Design uplinks
Choose fibre or DAC media, confirm distance and connector type, and verify that upstream ports operate at the required speed.
Confirm management
Identify where UniFi Network will run, who will administer it, how configuration backups are handled and how updates are approved.
Prepare the rack
Check rack depth, ventilation, patch panels, cable management, power distribution and any backup-power integration requirements.
Configure and validate
Apply port profiles, VLANs, link settings and security controls, then test endpoint connectivity, uplink resilience and monitoring.
Selective 2.5 GbE capacity
The eight 2.5 GbE ports are the defining access-layer capability of this model. They can be assigned to endpoints that routinely exceed Gigabit requirements, including compatible high-performance workstations, network-attached storage, servers and modern wireless infrastructure. The advantage is targeted capacity: an organisation can upgrade the devices that need more bandwidth without deploying a full set of higher-cost multi-gigabit ports.
Planning must be based on real traffic rather than interface speed alone. A 2.5 GbE link does not guarantee that an application, storage array or internet connection will run at that rate. Disk performance, server load, protocol overhead, wireless conditions, gateway throughput and congestion elsewhere in the topology may still set the practical limit. Teams should measure current utilisation and identify where higher-speed access produces a meaningful operational benefit.
Future device growth also matters. Eight ports may be adequate for a compact office today but restrictive where every desk, access point or creative workstation is expected to move above Gigabit. In such cases, a denser multi-gigabit model may produce a cleaner long-term design.
10G uplinks and traffic concentration
The two SFP+ interfaces allow the switch to connect upstream at up to 10 GbE per port. This is useful when traffic from multiple access ports converges toward a gateway, aggregation switch, server cluster or storage system. It can also support a resilient or aggregated topology when the selected upstream equipment and network design support the required configuration.
SFP+ deployment requires more than choosing a nominal speed. The optical module must match fibre type, wavelength, connector format and link distance. Direct-attach copper cables can be practical for short rack-to-rack or same-rack connections, but cable length and equipment compatibility should still be confirmed. Buyers should include all required modules, patch leads and cable-management items in the bill of materials.
A pair of 10G ports does not automatically mean twenty gigabits of usable bandwidth for every traffic flow. Link aggregation behaviour, hashing, application sessions and upstream capacity influence the result. FourTeck can review the intended topology and help identify whether both SFP+ interfaces will be used for uplink, redundancy, server connectivity or another role.
UniFi operations and Layer 3 planning
For teams already using UniFi, central management is often a major reason to select this switch. Administrators can work with port profiles, VLAN assignments, topology visibility, monitoring and supported routing features from a consistent interface. This can reduce the friction of managing isolated switches through separate local consoles, especially across standardised branch or campus designs.
Central management does not remove the need for governance. Organisations should define administrator roles, change approval, backups, update windows, alert handling and recovery procedures. Controller placement and availability should also be considered, particularly where remote sites depend on central oversight. Network documentation should record uplinks, VLANs, addressing, port assignments and any routing or access-control decisions.
Layer 3 capability can be useful for local routing within supported design boundaries, but complex firewall policy, advanced dynamic routing or security inspection may still belong on a dedicated gateway or firewall. Buyers should document required functions rather than assuming that every Layer 3 switch implements the same feature set.
Ideal business environments and use cases
Professional offices
Connect standard desktops and printers at Gigabit speed while reserving 2.5 GbE for selected workstations, local servers or wireless infrastructure.
Creative and media teams
Provide faster access for editors or designers working with central storage, subject to storage performance and end-to-end network capacity.
Education and training sites
Support mixed laboratories, administration devices and higher-speed teaching resources where PoE is supplied elsewhere.
Hospitality and retail back offices
Use managed segmentation for operational systems, staff networks and business applications while keeping powered edge devices on suitable PoE infrastructure.
Branch and satellite locations
Deploy a compact 1U switch where local users need a combination of ordinary access ports and faster connections back to central resources.
Small server or storage racks
Connect selected 2.5 GbE hosts and use SFP+ uplinks, while recognising that environments with dense 10 GbE demand may need a different platform.
Integration and operational considerations
A switch purchase should be evaluated as part of the complete network, not as an isolated port count. Confirm gateway throughput, VLAN architecture, IP addressing, DHCP services, firewall policy, wireless design and the capability of all upstream and downstream interfaces. A 2.5 GbE endpoint connected through a 1 GbE bottleneck elsewhere will not realise the expected capacity.
Cabling quality is equally important. Existing structured cabling should be assessed for the required link speed and distance. Patch leads, panels and terminations must be in good condition, and test records are valuable when multi-gigabit links are introduced into an older installation. Link negotiation issues should be investigated systematically rather than addressed by forcing speeds without understanding the cause.
Where business continuity matters, review power design, UPS capacity, DC backup options, spare transceivers and recovery documentation. Redundancy is a system property: adding a backup-power input or second uplink does not by itself remove all single points of failure. Gateway design, upstream switching, cabling routes, controller availability and application dependencies must be considered together.
Buyer questions to resolve before ordering
Procurement checklist
- Confirm exact model: USW-Pro-Max-24
- Record required quantity and deployment sites
- Count 1 GbE and 2.5 GbE endpoints separately
- Verify that PoE output is not required
- Specify SFP+ modules, DACs and fibre patch leads
- Check upstream switch or gateway compatibility
- Confirm rack depth and cable-management space
- Review UPS and DC backup requirements
- Identify the UniFi management host
- Document VLAN and port-profile requirements
- Include installation and configuration scope where needed
- Confirm regional version, lead time and warranty guidance
How FourTeck can assist
FourTeck can review the intended network role, confirm whether the non-PoE model is appropriate, compare nearby UniFi switch options and help prepare a clearer bill of materials. The review can cover endpoint counts, 2.5 GbE demand, SFP+ uplinks, transceiver selection, rack installation, controller planning and configuration scope.
For project requirements, buyers can also discuss switch adoption, VLAN configuration, port profiles, topology validation, migration sequencing and handover documentation. Service scope depends on the site, existing network, access arrangements and agreed quotation. Visit the FourTeck technology services page or explore related network and security products.
Information for an accurate quotation
Share the quantity, destination, required date, rack location, endpoint list, uplink design, management environment and any installation or configuration expectations. This helps distinguish the base switch from optional optics, cables, backup-power components and services.
UAE availability and support guidance
Contact FourTeck to confirm current UAE availability for the Ubiquiti Pro Max 24, including the applicable regional version, required quantity and expected vendor lead time. Availability can change according to model, shipment schedule and project volume, so no stock or delivery commitment should be assumed until it appears in a formal quotation. Buyers should also confirm whether SFP+ modules, direct-attach cables, rack accessories, backup-power components, installation and configuration are required as separate line items.
For deployments in Dubai, Abu Dhabi, Sharjah and Ajman, FourTeck can discuss delivery coordination, site readiness, rack installation, migration planning and configuration scope after the requirement is reviewed. On-site or remote assistance depends on location, access conditions, the existing network and the agreed statement of work. Use the FourTeck contact page to provide project details and request current commercial guidance.
GCC Availability
FourTeck can assist organisations planning UniFi switching requirements across GCC markets, including the United Arab Emirates, Saudi Arabia, Kuwait, Qatar, Bahrain and Oman. Support can begin with a review of the exact model, port-speed requirements, quantity, SFP+ media, rack design and any configuration or installation scope. For the USW-Pro-Max-24, it is particularly important to confirm that the non-PoE format matches the endpoint design and that any powered devices are supported through separate infrastructure. Product availability, regional versions, delivery schedules, service visits and vendor lead times can vary by country, quantity and project conditions. Buyers should provide the destination country, deployment location, required schedule and complete bill-of-material expectations so a suitable quotation can be coordinated. For Kuwait-based enquiries, the FourTeck Kuwait resource may also help begin the discussion.
Africa Availability
Organisations evaluating the Ubiquiti Pro Max 24 for African deployments can contact FourTeck for model review, accessory planning, quotation coordination and practical guidance on configuration or support requirements. Availability and fulfilment may depend on the destination, quantity, regional model, shipping arrangements, power design, vendor lead time and local project conditions. Buyers should share the destination country, intended topology, number of 2.5 GbE endpoints, uplink media, preferred schedule and any installation expectations. This information helps determine whether the non-PoE Pro Max 24 is suitable or whether another switch should be considered. FourTeck does not assume local inventory, immediate shipment or country-wide on-site coverage without confirmation. Regional information is available through FourTeck Africa, with additional resources for Kenya technology enquiries and Uganda business requirements.
Related options and complementary services
Pro Max 24 PoE
Consider the PoE version where access points, cameras, phones or other endpoints need switch-supplied power. Port power standards and total budget must be confirmed.
Pro Max 48
A higher-port-count alternative for sites that need more access connections. Compare copper port mix, uplinks, rack space and lifecycle growth.
10G SFP+ connectivity
Optical modules, DAC cables and fibre patch leads should be selected for the exact equipment, distance and connector format.
UniFi gateway and management
Review controller hosting, gateway throughput, VLAN policy and remote administration as part of the complete deployment.
Installation and configuration
Rack mounting, adoption, VLAN setup, port profiles, uplink testing and documentation can be included in an agreed service scope.
Why businesses contact FourTeck
Businesses often need more than a model number. They need to know whether the selected switch matches the endpoint mix, whether PoE is required, which uplink accessories belong in the order, and how the device fits the existing gateway, cabling and management platform. FourTeck can help clarify these dependencies before commercial approval, reducing the risk of an incomplete bill of materials.
Assistance may include model comparison, port and capacity review, compatibility questions, quotation coordination, rack and power planning, configuration scope, migration sequencing and support discussions. The final recommendation depends on the information supplied by the buyer and should be validated against the current project requirements. Learn more about FourTeck or discuss the requirement directly with the sales team.
Frequently asked questions
Does the USW-Pro-Max-24 provide PoE?
No. This exact model is the non-PoE version. Devices requiring power over Ethernet need another PoE switch, a suitable injector or a local power adapter.
How many 2.5 GbE ports are included?
The switch provides eight 2.5 GbE RJ45 ports. The remaining sixteen copper ports support up to 1 GbE.
Can it connect to a 10G network?
Yes. It includes two SFP+ interfaces supporting 10G or 1G operation. The correct optical modules, fibre or DAC cables and upstream interfaces must be confirmed.
Is it suitable for Wi-Fi 6 or Wi-Fi 7 access points?
Its 2.5 GbE ports may suit compatible access points, but this non-PoE switch cannot power them. Check the access point Ethernet speed, PoE standard and complete power design.
Does the switch require UniFi management?
It is designed for the UniFi ecosystem. Confirm the compatible UniFi console or controller, administrator access, backup policy and software-version requirements.
Can it perform Layer 3 routing?
The model supports Layer 3 features. Buyers should compare the exact routing, ACL and network-policy requirements with the current UniFi feature set before relying on it for a specific design.
What should be included with the quotation?
Include the switch quantity, SFP+ modules or DAC cables, fibre patching, rack accessories, power protection, backup-power components and any installation or configuration services required.
Is the USW-Pro-Max-24 available in Dubai?
Contact FourTeck to confirm current UAE availability, regional version, quantity, price and lead time. Availability should not be assumed until confirmed in a quotation.
Can FourTeck help with installation and configuration?
Installation, adoption, VLAN setup, port profiles, uplink validation and documentation can be discussed. The final scope depends on the site and agreed quotation.
Confirm the right Pro Max 24 design before purchase
Share your endpoint count, required port speeds, uplink plan, destination and service expectations. FourTeck can help verify the model and prepare a project-specific quotation.



Reviews
There are no reviews yet.