Ubiquiti airFiber 11 High-Band Complete AF11-Complete-HB Dubai

Ubiquiti airFiber 11 High-Band Complete for Licensed Backhaul

The Ubiquiti airFiber 11 High-Band Complete AF11-Complete-HB is an outdoor point-to-point backhaul package for organisations that need a dedicated, high-capacity wireless link in the licensed 11 GHz band. It combines the AF-11 radio, a high-band duplexer for SISO operation and the AF-11G35 dish antenna, making it relevant to service providers, campuses, industrial sites, hospitality groups and enterprises connecting buildings or remote facilities.

Selection should begin with a professional path study, local spectrum and licensing confirmation, required throughput, link distance, tower loading, grounding, power and Ethernet surge protection. Buyers planning MIMO operation must also confirm the additional matching high-band duplexer and the applicable licensing requirements for both polarisations. The quoted bill of materials should cover both ends of the link, mounting hardware, cabling, protection, installation and alignment services where required.

FourTeck can assist with requirement review, model validation, accessory planning, configuration scope and quotation coordination for Dubai and wider UAE projects. Contact FourTeck to confirm current availability, regional suitability and the complete deployment requirement before ordering.

SKU: UBIQUITI-AF11-COMPLETE-HB-DUBAI Category:
Licensed 11 GHz point-to-point backhaul

Ubiquiti airFiber 11 High-Band Complete AF11-Complete-HB in Dubai, UAE

A complete high-band radio and dish platform for organisations planning dedicated outdoor wireless backhaul where licensed spectrum, predictable link engineering and controlled deployment matter more than plug-and-play convenience.

Plan the complete link

Share both site locations, target capacity, tower details and required service scope so the correct bill of materials can be reviewed.

Request Product Consultation

Product type
Outdoor licensed-band PtP backhaul
Frequency platform
11 GHz, region dependent
Included RF mode
SISO-ready high-band configuration
Important dependency
Licensing and path design required

Direct answer for buyers

The AF11-Complete-HB is a Ubiquiti airFiber package for a high-band licensed 11 GHz point-to-point wireless link. It is mainly used to carry network traffic between two fixed sites, such as buildings, towers, campuses, resorts, industrial locations or service-provider points of presence. It should be considered by buyers who can obtain the required spectrum authorisation and who need a carefully engineered alternative or complement to fibre. Before proceeding, confirm the exact transmit and receive frequency plan, regulatory permission, line of sight, path clearance, link budget, required throughput, mounting structure, power arrangement, grounding, surge protection and whether SISO or MIMO is required.

What the package does

The system creates a dedicated full-duplex wireless bridge between two fixed points. Instead of sharing crowded unlicensed spectrum, it operates in the licensed 11 GHz market, subject to local frequency planning and approval. This makes it relevant where interference control and engineered link behaviour are central purchasing requirements.

The complete high-band package combines an AF-11 radio, an AF-11G35 dish and one high-band duplexer installed for SISO. A functioning link normally needs appropriately configured equipment at both ends, with complementary transmit and receive arrangements.

Who it suits

The product may suit internet service providers, education and healthcare campuses, large hospitality properties, logistics operators, utility sites, industrial estates and enterprises connecting geographically separated facilities. It is especially relevant when trenching fibre is difficult, expensive or slow, yet the organisation can support professional RF planning.

It is less suitable for buyers seeking an unlicensed, self-installed bridge or a link that has not been checked for spectrum permission, structural loading, path clearance and safe outdoor installation.

Business challenges this platform can address

Connecting separated sites

A point-to-point link can carry business network traffic between buildings or towers where direct cabling is impractical. The path must have suitable clearance and must be engineered for the intended distance and availability target.

Reducing unlicensed-band congestion

Licensed operation can provide a more controlled RF environment than busy shared bands, but the benefit depends on correct coordination, authorised frequencies and disciplined deployment.

Building a fibre alternative

A microwave backhaul may support projects that need connectivity before fibre arrives or where civil work is not economical. It should be evaluated against fibre for capacity, maintenance, weather margin and lifecycle cost.

Extending carrier or campus networks

The system can be used as part of a wider routed or switched network. VLAN design, redundancy, power backup, monitoring and operational ownership remain separate design decisions.

Core capability band

1.2+ Gbps stated maximum throughput

Actual usable capacity depends on channel width, mode, modulation, signal quality, regulatory limits and link design.

SISO and optional MIMO modes

The package is SISO-ready. MIMO requires an additional AF-11-DUP-H duplexer and appropriate licensing for both polarisations.

Selectable channel widths

Supported channel options are subject to country and regulatory availability; the licensed channel plan must drive configuration.

Outdoor engineered platform

The radio and 35 dBi dish are intended for fixed outdoor links with professional mounting, alignment and grounding.

Product-fit decision matrix

RequirementSuitable whenConfirm before ordering
Licensed microwave backhaulThe organisation can obtain and operate within an approved 11 GHz channel plan.Regulator, assigned frequencies, bandwidth and polarisation.
High-capacity site linkThe target capacity fits the radio design and path conditions.Traffic profile, availability target, modulation margin and Ethernet design.
SISO deploymentOne licensed polarisation and the included high-band duplexer meet the requirement.Complementary frequency arrangement at both ends.
MIMO deploymentAdditional capacity is required and both polarisations can be licensed.Second AF-11-DUP-H per radio and two-polarisation licensing.
Long outdoor pathLine of sight, Fresnel clearance and fade margin are acceptable.Professional path profile, rain analysis, tower height and wind loading.

Verified technical information

Values below describe the AF11-Complete-HB platform and remain subject to regional regulations and final configuration.

BrandUbiquiti
ModelAF11-Complete-HB
Product type11 GHz high-band outdoor point-to-point backhaul radio with dish antenna
Operating frequency10.7 to 11.7 GHz; regional rules apply
Maximum throughput1.2+ Gbps stated maximum; configuration and link conditions apply
ModesSISO and MIMO; one high-band duplexer is pre-installed for SISO
MIMO requirementSecond AF-11-DUP-H duplexer and appropriate licence arrangement
Channel widths3.5, 5, 7, 10, 14, 20, 28, 30, 40, 50 and 56 MHz selectable; availability varies by region
Networking interfacesOne Gigabit Ethernet RJ45 data port and one 10/100 Ethernet management port
PowerPassive PoE or terminal-block direct wire; 50 V DC, 1.2 A Gigabit PoE adapter included
Voltage and consumption38 to 56 V DC supported; 36 W maximum consumption
Radio dimensions and weight327 × 112 × 86 mm; 2.3 kg
Dish antennaAF-11G35, 35 dBi gain, 10.3 to 11.7 GHz, pole mount
Dish dimensions811 × 811 × 460 mm
Operating temperature-40 to 55 °C
Encryption128-bit AES

Licensing, compatibility and prerequisite notice

AF11-Complete-HB is not simply an outdoor bridge that can be installed on any convenient frequency. The 11 GHz band is licensed, and the permitted channels, bandwidths, transmit power, polarisation and coordination process depend on the destination country and regulator. A buyer should not place an order based only on distance or a desired throughput figure.

The high-band and low-band arrangements at opposite ends must be designed around the assigned transmit and receive frequencies. In SISO mode, each radio uses one matching duplexer, positioned so that the paired radios have complementary frequency orientation. MIMO adds a second chain and requires another duplexer of the same band type for each radio, together with licences that support the second polarisation.

Compatibility should also cover tower and pole dimensions, antenna loading, Ethernet equipment, PoE arrangements, grounding, surge protection, cable type, weatherproofing, network design, monitoring responsibilities and access for maintenance. FourTeck can help organise the commercial bill of materials, but regulatory approval and a qualified path and structural assessment remain essential project inputs.

A practical purchase and deployment journey

1

Define the business requirement

Document both sites, expected traffic, peak demand, latency sensitivity, availability target, required service date and whether the link is primary, backup or temporary infrastructure.

2

Complete the path and regulatory study

Check coordinates, elevation, obstructions, Fresnel clearance, rain region, fade margin, antenna height, spectrum assignment and any local approval or coordination requirement.

3

Build the complete bill of materials

Confirm two link ends, duplexer mode, mounts, shielded cabling, surge protection, grounding materials, power backup, switches, routers, spares and any installation or configuration services.

4

Install, align and validate

Use qualified personnel for tower work, grounding and precision alignment. Record RSSI, modulation, capacity, error rates, Ethernet status, frequency settings and failover behaviour against the design.

5

Document and operate

Keep the licensed frequency plan, credentials, diagrams, photographs, grounding records, baseline performance, maintenance access and escalation contacts with the network documentation.

Capacity that must be engineered

The maximum throughput figure is useful for product positioning, but it is not a guaranteed application rate. Channel width, SISO or MIMO mode, modulation, link distance, receive level, interference, regulatory power limits and packet profile affect achieved performance. A good design starts with the required committed traffic and builds sufficient margin rather than selecting solely by the largest published number.

Buyers should also consider Ethernet overhead, routed or bridged topology, VLANs, QoS, multicast, redundancy and the capacity of connected switches and routers. Monitoring should track both RF and Ethernet health so that degradation is identified before users experience a major impact.

Frequency and duplex planning

The AF-11 platform uses frequency-division duplexing, so transmit and receive frequencies are separated and reversed between the two ends. The duplexer orientation and high-band selection must align with the licensed plan. Incorrect pairing can prevent the link from operating even when the radios and antennas are otherwise installed correctly.

For MIMO, the second high-band duplexer is not merely an optional performance accessory; it becomes part of the RF architecture and licensing discussion. The final order should therefore identify SISO or MIMO explicitly and state the assigned channel pair and polarisation plan.

Outdoor reliability foundations

Reliable microwave service depends heavily on installation quality. Tower rigidity, antenna alignment, grounding, shielded outdoor cable, drip loops, connector weatherproofing, surge protection, stable power and adequate UPS runtime should be treated as part of the product decision rather than afterthoughts.

The dish has a narrow beamwidth, so precision alignment and secure mounting are important. Structural suitability and wind loading must be checked for the actual mounting position. Scheduled inspection should verify mounting hardware, corrosion, cable condition, grounding continuity and link statistics.

Ideal business environments and use cases

Campus building interconnect

Connect administration, teaching, clinical, accommodation or operations buildings where a clear fixed path exists and licensed spectrum is preferred.

ISP and WISP backhaul

Transport aggregated subscriber traffic between tower sites or network nodes, subject to capacity planning, redundancy and regulatory coordination.

Industrial and logistics sites

Link warehouses, yards, processing locations or remote operational facilities where trenching is disruptive and outdoor access can be managed safely.

Hospitality and resort networks

Extend core connectivity to detached properties, service buildings or remote amenities when visual, structural and licensing requirements are acceptable.

Temporary fibre replacement

Support planned interim connectivity while a permanent circuit is arranged, provided the licensing timeline and mounting investment make commercial sense.

Resilient secondary path

Create a physically diverse backup path where routing, power independence and failure-domain separation are designed end to end.

Integration and operational considerations

The AF11 link becomes one segment of the wider network. Decide whether it will extend Layer 2 between sites or sit between routed interfaces. Large bridged domains can simplify some deployments but may also expand broadcast scope and fault impact. Routed design can provide clearer boundaries, while redundancy protocols and dynamic routing may improve resilience when a second path exists.

Management access should be separated and protected. Use strong credentials, restrict administrative source addresses, keep a controlled configuration backup and record the radio management IPs. Time synchronisation, logging and alerting should be integrated into existing operations where practical. The business should know who owns RF troubleshooting, network troubleshooting, physical access and licence administration.

Power planning is equally important. The included adapter supports the radio, but a production link may also require surge protection, conditioned power, a UPS, generator support or monitored DC systems. Backup duration should reflect the role of the link and the recovery time for each site.

Finally, account for maintenance access. A high-mounted dish can require trained climbing personnel, permits and suitable weather conditions for intervention. Keeping a compatible spare radio or duplexer may be justified for critical links, but the spare strategy should match the organisation’s service objective and budget.

Buyer questions to resolve before requesting a quote

What are the exact coordinates and elevations?

A path study needs accurate locations and proposed antenna heights, not only city or building names.

What capacity is required now and later?

State average, peak and growth expectations, plus any application with strict latency or availability needs.

Has the 11 GHz channel been assigned?

Provide the approved transmit and receive frequencies, bandwidth, polarisation and power limits when available.

Is SISO or MIMO planned?

MIMO affects duplexer quantity, licensing, configuration and the final bill of materials.

What mounting structure is available?

Confirm pole diameter, loading, access, grounding point, cable route and ownership approvals.

What service scope is needed?

Separate supply, configuration, installation, alignment, testing, documentation and ongoing support requirements.

Procurement checklist

☐ Exact model AF11-Complete-HB and required quantity

☐ Two complete and correctly paired link ends

☐ Assigned high-band transmit and receive frequencies

☐ Approved channel width and polarisation

☐ SISO or MIMO architecture

☐ Additional AF-11-DUP-H units for MIMO

☐ Path profile, fade margin and antenna height

☐ Pole, tower and wind-loading suitability

☐ Shielded Ethernet cable and surge protection

☐ Grounding and lightning-protection scope

☐ PoE, UPS and backup-power requirement

☐ Installation, alignment and test documentation

☐ Network integration and management addressing

☐ Warranty, lead time and regional availability confirmation

How FourTeck can assist

FourTeck can help buyers translate a site-connectivity requirement into a clearer quotation request. Assistance may include validating the requested model, identifying whether the high-band package matches the licensed plan, discussing SISO versus MIMO, preparing an accessory checklist and coordinating supply, configuration or installation scope where available.

For projects that are still at an early stage, share the site coordinates, approximate path distance, target capacity, deployment role and timeline. This allows the conversation to focus on missing engineering inputs rather than producing a premature equipment-only quote. Where a radio path assessment, structural review or spectrum process is required, these should be identified before finalising the purchase.

You can also review related business networking products, discuss installation and configuration services, or contact the FourTeck technology team with the complete requirement.

UAE availability and support guidance

Contact FourTeck to confirm current UAE availability for AF11-Complete-HB, the required quantity and any additional AF-11-DUP-H duplexers. Availability may depend on vendor lead time, regional supply, quantity and the exact configuration. Delivery planning should begin only after the model, duplexer arrangement and destination are confirmed.

Projects in Dubai, Abu Dhabi, Sharjah and Ajman can be discussed through one combined requirement review covering quotation coordination, delivery destination, installation access, configuration scope and documentation expectations. Installation dates, tower access and spectrum approvals are project dependent and should not be assumed from product availability alone.

GCC Availability

FourTeck can assist organisations evaluating AF11-Complete-HB for GCC backhaul projects by reviewing the requested model, high-band frequency requirement, duplexer mode, quantity, accessories and intended deployment scope. Requirements may arise in the United Arab Emirates, Saudi Arabia, Kuwait, Qatar, Bahrain or Oman, but the same equipment configuration cannot be assumed to be valid in every market. Licensed channel plans, regulatory procedures, allowed bandwidths, transmit limits, service availability and import arrangements may differ.

Buyers should share the destination country, exact site locations, required capacity, SISO or MIMO preference, quantity, target schedule and whether installation, alignment or configuration is part of the request. Product availability, licensing, delivery schedules, service visits and vendor lead times vary by country and project. For regional coordination, explore FourTeck Kuwait resources or submit the complete requirement through the main contact channel.

Africa Availability

Organisations planning licensed microwave links in Africa can contact FourTeck for product and procurement guidance covering the AF11-Complete-HB radio-and-dish package, duplexer selection, accessories, configuration scope and support expectations. The suitability of the platform depends on the destination’s frequency rules, assigned channel, path environment, rain characteristics, mounting infrastructure, power conditions and local project resources. A design that works in one market should not be copied to another without a fresh regulatory and path review.

Share the destination country, site coordinates, quantity, preferred deployment schedule, target capacity and any installation or support expectation. Availability and fulfilment can depend on product lead time, shipping arrangements, licence region, power requirements and local conditions. Buyers in East Africa may review Kenya technology support and Uganda project resources, while wider enquiries can use the FourTeck Africa portal.

Related products and services to consider

AF-11-DUP-H duplexer

Required as a second matching high-band duplexer when MIMO is selected. Quantity and licensing should be confirmed per radio.

Path assessment

A link budget and terrain review help validate antenna height, fade margin and expected performance before equipment is committed.

Grounding and surge protection

Outdoor Ethernet and power protection should be designed as part of the installation, not treated as optional finishing items.

Professional alignment

Narrow-beam microwave links need accurate mechanical alignment, secure mounting and recorded acceptance measurements.

Routing and switching

Evaluate VLANs, redundancy, QoS, failover and management connectivity around the radio link.

Alternative backhaul platforms

Where licensing, path or capacity requirements differ, compare other licensed, unlicensed or fibre options rather than forcing one model into every site.

Why businesses contact FourTeck

The value of a procurement discussion is not limited to confirming a part number. Buyers often need help identifying missing information that could change the order: the licensed frequency pair, high-band versus low-band selection, SISO versus MIMO, duplexer quantity, mounting constraints, power protection and the scope of installation or testing.

FourTeck can coordinate requirement clarification, bill-of-material guidance, quotation preparation, availability checks and service-scope discussions without presenting unconfirmed stock, delivery or performance promises. Learn more about FourTeck or use the contact page to send the project details.

Frequently asked questions

What is included in AF11-Complete-HB?

The package combines the AF-11 radio, AF-11G35 dish antenna and one high-band duplexer pre-installed for SISO operation, together with the stated power adapter and mounting components. Confirm current package contents when ordering.

Do I need two complete units?

A point-to-point link requires equipment at both ends. The exact pairing, frequency orientation and duplexer arrangement must match the licensed channel plan.

Is the 11 GHz licence included?

No licence should be assumed to be included with the hardware. Spectrum authorisation and coordination depend on the destination country and regulator.

What is required for MIMO?

MIMO requires a second AF-11-DUP-H high-band duplexer for each radio and licensing that supports both polarisations. Confirm this before finalising the quantity.

Can the product deliver 1.2+ Gbps on every path?

No fixed result should be assumed. Throughput depends on mode, channel width, modulation, signal quality, regulatory limits, link distance and environmental conditions.

How far can an AF11 link operate?

The manufacturer publishes a very long maximum range figure, but practical distance must be determined by path profile, antenna height, rain fade, legal power and the required availability margin.

Can it be installed without a path study?

That is not advisable for a licensed microwave project. A path and regulatory review reduces the risk of blocked clearance, inadequate fade margin, incorrect frequencies or unsuitable mounting.

Does FourTeck provide installation and alignment?

Installation, alignment, configuration and testing can be discussed as part of the requirement. Scope and regional availability must be confirmed in the quotation.

How can I request an accurate Dubai quote?

Send the model, quantity, both site coordinates, target capacity, assigned frequencies if available, SISO or MIMO preference, mounting details and required service scope.

Confirm the model, frequency plan and complete deployment scope

A reliable AF11 purchase begins with the licensed channel and engineered path. Send FourTeck the site and capacity details for a structured product and service quotation.

Request QuoteConfirm Model and License

Discuss Your AF11 Requirement

Reviews

There are no reviews yet.

Be the first to review “Ubiquiti airFiber 11 High-Band Complete AF11-Complete-HB Dubai”

Your email address will not be published. Required fields are marked *

Scroll to Top
Powered by Joinchat